Walker's Point
Cross-Connection Co.
Test Cycle Q2 · 2026
425 W. Florida St., Mke 53204
WI DSPS CCCT-2118 · Q1 closed 31 Mar 2026 · Q2 in cycle — due 30 Jun 2026 · Q3 opens 01 Jul 2026 · Q4 closes 31 Dec 2026 · MWW §295-1 compliant · USC FCCCHR Listed
Cross-Connection Control · Backflow Prevention · Est. 2014

A serpentine path
kept one-way.

A seven-person Walker's Point crew that tests, repairs, and submits backflow-prevention assemblies for restaurants, clinics, schools, foundries, and multifamily buildings across Milwaukee County. We file your annual paperwork before Milwaukee Water Works sends the second postcard.

Schedule a test   Browse assemblies

The premise

Every commercial water service in Milwaukee has at least one place where the potable supply touches something it shouldn't — a janitor's mop sink with a hose hooked to a chemical jug, a dental vacuum that pulls solids into a saliva ejector, a soda-machine carbonator that lets CO₂ press a copper line back into citric acid, a boiler feed dosed with glycol, a fire-line riser parked under positive pressure. A backflow prevention assembly is the mechanical promise that the city's water moves one way only. The state of Wisconsin requires that promise be inspected, in person, once a year, by a certified tester who carries a calibrated gauge, signs a test report, and submits it to the water purveyor before the deadline.1

That paperwork is what we do. Walker's Point Cross-Connection Co. is a seven-person crew on the second floor of an 1898 Cream-City-brick warehouse on West Florida Street, four blocks from the Milwaukee River and one block from the historic Walker's Point rail siding. We carry an ASSE 5110 backflow-tester credential, an ASSE 5130 repair-technician credential, and an ASSE 5150 trainer credential between us, plus a WI DSPS Master Plumber license that lets us replace a broken assembly the same hour we condemn it. We work on commercial premises only: food service, medical, dental, veterinary, irrigation-with-chemical-injection, fire service, light industrial, and 5-units-and-up multifamily.2

We don't repair water heaters. We don't unclog drains. We don't do residential service calls. What we do is keep a four-drawer steel cabinet of USC FCCCHR-listed rebuild kits in stock, run a thirty-six-week recertification calendar that lines up with each premises type's hazard class, and file annual Milwaukee Water Works test reports on the same day the test is performed — never in batch, never late, never on a postcard ten months overdue.

"Backflow can be back-pressure or back-siphonage. Either way the water doesn't read the arrows on the pipe." — ASSE Series 5000 instructor manual, §2.1

Most recent test cycle

DatePremisesHazardDeviceMfr / ModelSerialResultTester
2026-05-15Three Bridges Medical Group · 2235 S. HowellHighRP · 1"Watts 909WT-449182PassL. Stoltzfus
2026-05-14Escuela de Walker · 312 W. BruceHighRPDA · 4"Wilkins 350ADAZW-77104PassA. Ferraro
2026-05-14Menomonee Valley Foundry · 1110 W. BruceHighRP · 2"Apollo 4ALF-500AP-318822Fail · CK-2 fouledA. Ferraro
2026-05-13Bay View Tap House · 2535 S. KinnickinnicModDC · 3/4"Febco 850FB-227019PassM. Okafor
2026-05-12Mitchell Park Domes · 524 S. LaytonHighRP · 1.5"Watts 909WT-449180Re-test 22 MayL. Stoltzfus
2026-05-11St. Stanislaus Catholic School · 524 W. MitchellModPVB · 1"Febco 765FB-118337PassM. Okafor
2026-05-08Riverwest Co-Op Grocery · 733 E. ClarkeModDC · 1"Wilkins 350ZW-66110PassM. Okafor
2026-05-07Lakefront Brewery · 1872 N. CommerceHighRP · 3"Watts 957WT-228005PassA. Ferraro

All reports filed same-day with Milwaukee Water Works Cross-Connection Control Section. Re-tests scheduled within 10 business days of a Fail finding per MWW §295-1(C)(7).

Assemblies we test

Six assembly families cover ninety-eight percent of Milwaukee's commercial premises. Each entry below links to a data sheet listing the ASSE standard, USC FCCCHR-approved manufacturers and models we keep parts for, the hazard classes the device is appropriate to, the failure modes we look for, and the rebuild interval we recommend.

Type RP · ASSE 1013

Reduced Pressure Principle Assembly

Two checks plus a vented intermediate zone. The only family approved for high-hazard cross-connections — chemical, dental, foundry, dye, irrigation-with-injection.

Hazard: High~$340 test + report
Type DC · ASSE 1015

Double Check Valve Assembly

Two checks in series, no atmospheric vent. Moderate-hazard service: tankless heaters, fire lines without chemical, sealed boilers, secondary irrigation without injection.

Hazard: Moderate~$240 test + report
Type PVB · ASSE 1020

Pressure Vacuum Breaker

Single check plus an air-inlet vent above flood-rim. Common on irrigation laterals; back-pressure-rated only upstream of the last lateral shutoff.

Hazard: High back-siphonage~$185 test + report
Type SVB · ASSE 1056

Spill-Resistant Vacuum Breaker

A PVB with a spring-loaded check that prevents the start-up dribble. Specified on indoor PVB locations where the air-gap discharge would be a nuisance.

Hazard: Back-siphonage~$185 test + report
5/8" meter
Type RPDA · ASSE 1047

Reduced Pressure Detector Assembly

An RP with a parallel 5/8″ bypass meter to log low-flow events — installed on a fire service line so an unauthorized tap shows up on the utility's read.

Hazard: High · Fire service~$520 test + report
5/8" meter
Type DCDA · ASSE 1048

Double Check Detector Assembly

A DC with a parallel detection meter for moderate-hazard fire service. The standard answer for a sprinkler-only fire line carrying no antifreeze and no foam.

Hazard: Moderate · Fire service~$420 test + report
1,418Active accounts
~2,950Tests / year (2025)
3ASSE 5110 testers on roster
98.4%Reports filed same-day
$0Late-fee surcharges in 2025

Work we sign for

  • Annual ASSE 5110 testing

    Scheduled per premises hazard class (high-hazard at 12-month intervals, moderate at 12 with site-by-site review). Five-valve sequence on RP, three-valve on DC, two-valve on PVB. Gauge cert traceable to NIST within 12 months.

  • Repair & rebuild

    ASSE 5130 rebuilds of CK-1, CK-2, and relief-vent diaphragms on Watts 909/957, Wilkins 350/375, Apollo 4ALF, Conbraco 40-200, Febco 825/860. We stock kits for the eleven models that account for 84% of Milwaukee's installed base.

  • New install

    Premise-isolation and containment installs on commercial water services from 3/4″ through 6″. Wall-bracket or pad-mounted with code-required air-gap drains, freeze protection, and access clearance per SPS 382.41(11).

  • Cross-connection hazard survey

    A walking, drawing-based hazard survey of an existing premises. Output: a numbered list of fixtures, hose-bibb tags, and process equipment with required protection level keyed to USC FCCCHR Manual §3.4. The deliverable an AHJ wants to see when there's a question.

  • AHJ submittal & coordination

    We submit your test reports to Milwaukee Water Works on the day they're performed, track the response, and field any rejection. Same in the suburbs: Wauwatosa, West Allis, Glendale, Brown Deer, Greenfield, Mequon, Brookfield each have their own form and their own quirks. We know them.

References

  1. Wisconsin Department of Safety and Professional Services, SPS 382.41 — Cross-connection control. docs.legis.wisconsin.gov/code/admin_code/sps/.../382/IV/41
  2. American Society of Sanitary Engineering. Series 5000 Standard for Professional Qualifications. asse-plumbing.org