A serpentine path
kept one-way.
A seven-person Walker's Point crew that tests, repairs, and submits backflow-prevention assemblies for restaurants, clinics, schools, foundries, and multifamily buildings across Milwaukee County. We file your annual paperwork before Milwaukee Water Works sends the second postcard.
The premise
Every commercial water service in Milwaukee has at least one place where the potable supply touches something it shouldn't — a janitor's mop sink with a hose hooked to a chemical jug, a dental vacuum that pulls solids into a saliva ejector, a soda-machine carbonator that lets CO₂ press a copper line back into citric acid, a boiler feed dosed with glycol, a fire-line riser parked under positive pressure. A backflow prevention assembly is the mechanical promise that the city's water moves one way only. The state of Wisconsin requires that promise be inspected, in person, once a year, by a certified tester who carries a calibrated gauge, signs a test report, and submits it to the water purveyor before the deadline.1
That paperwork is what we do. Walker's Point Cross-Connection Co. is a seven-person crew on the second floor of an 1898 Cream-City-brick warehouse on West Florida Street, four blocks from the Milwaukee River and one block from the historic Walker's Point rail siding. We carry an ASSE 5110 backflow-tester credential, an ASSE 5130 repair-technician credential, and an ASSE 5150 trainer credential between us, plus a WI DSPS Master Plumber license that lets us replace a broken assembly the same hour we condemn it. We work on commercial premises only: food service, medical, dental, veterinary, irrigation-with-chemical-injection, fire service, light industrial, and 5-units-and-up multifamily.2
We don't repair water heaters. We don't unclog drains. We don't do residential service calls. What we do is keep a four-drawer steel cabinet of USC FCCCHR-listed rebuild kits in stock, run a thirty-six-week recertification calendar that lines up with each premises type's hazard class, and file annual Milwaukee Water Works test reports on the same day the test is performed — never in batch, never late, never on a postcard ten months overdue.
Most recent test cycle
| Date | Premises | Hazard | Device | Mfr / Model | Serial | Result | Tester |
|---|---|---|---|---|---|---|---|
| 2026-05-15 | Three Bridges Medical Group · 2235 S. Howell | High | RP · 1" | Watts 909 | WT-449182 | Pass | L. Stoltzfus |
| 2026-05-14 | Escuela de Walker · 312 W. Bruce | High | RPDA · 4" | Wilkins 350ADA | ZW-77104 | Pass | A. Ferraro |
| 2026-05-14 | Menomonee Valley Foundry · 1110 W. Bruce | High | RP · 2" | Apollo 4ALF-500 | AP-318822 | Fail · CK-2 fouled | A. Ferraro |
| 2026-05-13 | Bay View Tap House · 2535 S. Kinnickinnic | Mod | DC · 3/4" | Febco 850 | FB-227019 | Pass | M. Okafor |
| 2026-05-12 | Mitchell Park Domes · 524 S. Layton | High | RP · 1.5" | Watts 909 | WT-449180 | Re-test 22 May | L. Stoltzfus |
| 2026-05-11 | St. Stanislaus Catholic School · 524 W. Mitchell | Mod | PVB · 1" | Febco 765 | FB-118337 | Pass | M. Okafor |
| 2026-05-08 | Riverwest Co-Op Grocery · 733 E. Clarke | Mod | DC · 1" | Wilkins 350 | ZW-66110 | Pass | M. Okafor |
| 2026-05-07 | Lakefront Brewery · 1872 N. Commerce | High | RP · 3" | Watts 957 | WT-228005 | Pass | A. Ferraro |
All reports filed same-day with Milwaukee Water Works Cross-Connection Control Section. Re-tests scheduled within 10 business days of a Fail finding per MWW §295-1(C)(7).
Assemblies we test
Six assembly families cover ninety-eight percent of Milwaukee's commercial premises. Each entry below links to a data sheet listing the ASSE standard, USC FCCCHR-approved manufacturers and models we keep parts for, the hazard classes the device is appropriate to, the failure modes we look for, and the rebuild interval we recommend.
Reduced Pressure Principle Assembly
Two checks plus a vented intermediate zone. The only family approved for high-hazard cross-connections — chemical, dental, foundry, dye, irrigation-with-injection.
Double Check Valve Assembly
Two checks in series, no atmospheric vent. Moderate-hazard service: tankless heaters, fire lines without chemical, sealed boilers, secondary irrigation without injection.
Pressure Vacuum Breaker
Single check plus an air-inlet vent above flood-rim. Common on irrigation laterals; back-pressure-rated only upstream of the last lateral shutoff.
Spill-Resistant Vacuum Breaker
A PVB with a spring-loaded check that prevents the start-up dribble. Specified on indoor PVB locations where the air-gap discharge would be a nuisance.
Reduced Pressure Detector Assembly
An RP with a parallel 5/8″ bypass meter to log low-flow events — installed on a fire service line so an unauthorized tap shows up on the utility's read.
Double Check Detector Assembly
A DC with a parallel detection meter for moderate-hazard fire service. The standard answer for a sprinkler-only fire line carrying no antifreeze and no foam.
Work we sign for
-
Annual ASSE 5110 testing
Scheduled per premises hazard class (high-hazard at 12-month intervals, moderate at 12 with site-by-site review). Five-valve sequence on RP, three-valve on DC, two-valve on PVB. Gauge cert traceable to NIST within 12 months.
-
Repair & rebuild
ASSE 5130 rebuilds of CK-1, CK-2, and relief-vent diaphragms on Watts 909/957, Wilkins 350/375, Apollo 4ALF, Conbraco 40-200, Febco 825/860. We stock kits for the eleven models that account for 84% of Milwaukee's installed base.
-
New install
Premise-isolation and containment installs on commercial water services from 3/4″ through 6″. Wall-bracket or pad-mounted with code-required air-gap drains, freeze protection, and access clearance per SPS 382.41(11).
-
Cross-connection hazard survey
A walking, drawing-based hazard survey of an existing premises. Output: a numbered list of fixtures, hose-bibb tags, and process equipment with required protection level keyed to USC FCCCHR Manual §3.4. The deliverable an AHJ wants to see when there's a question.
-
AHJ submittal & coordination
We submit your test reports to Milwaukee Water Works on the day they're performed, track the response, and field any rejection. Same in the suburbs: Wauwatosa, West Allis, Glendale, Brown Deer, Greenfield, Mequon, Brookfield each have their own form and their own quirks. We know them.
Three premises from the book
Escuela de Walker
- Premises
- Bilingual K-8 charter · 312 W. Bruce St.
- Built
- 1903 · masonry · 28k sq ft
- Devices
- 1× RPDA 4″ (combo fire/domestic) + 3× RP 1″ (chem-tank, hose-bibb, lab)
- Hazard
- High — chemistry classroom + bilingual food-service program
- Cycle
- Annual, May test window since 2017
Three Bridges Medical Group
- Premises
- 4-suite medical/dental · 2235 S. Howell, Bay View
- Built
- 1972 · CMU + steel · 11k sq ft
- Devices
- 3× RP 1″ (dental vacuum, autoclave fill, eyewash) + 1× DC 1.5″
- Hazard
- High — dental + chemo-prep
- Cycle
- Annual, May; semi-annual on dental vacuum since 2022
Menomonee Valley Foundry
- Premises
- Light foundry · 1110 W. Bruce St., Menomonee Valley
- Built
- 1923 · brick + steel-truss · 64k sq ft
- Devices
- 4× RP 2″ (cooling-loop chem, quench bath) + 1× DCDA 6″ (fire service)
- Hazard
- High — glycol + acid pickling
- Cycle
- Annual, May test window since 2019; on the second floor of the same building Allis-Chalmers used as a pattern shop
Cross-references
Codes and references
SPS 382, ASSE 5000 series, USC FCCCHR Manual 10th, MWW §295-1.
About · § 08The crew, the building, the cabinet
Why we operate out of a Cream-City warehouse on West Florida Street.
Glossary · § 09Backflow vocabulary
Air-gap, back-pressure, back-siphonage, containment, isolation, premise.
Visit · § 10Walker's Point shop
Parking, ferry-shuttle, bus, bicycle approach from the Hank Aaron Trail.
References
- Wisconsin Department of Safety and Professional Services, SPS 382.41 — Cross-connection control. docs.legis.wisconsin.gov/code/admin_code/sps/.../382/IV/41
- American Society of Sanitary Engineering. Series 5000 Standard for Professional Qualifications. asse-plumbing.org