Walker's Point
Cross-Connection Co.
Test Cycle Q2 · 2026
425 W. Florida St., Mke 53204
WI DSPS CCCT-2118 · Q1 closed 31 Mar 2026 · Q2 in cycle — due 30 Jun 2026 · Q3 opens 01 Jul 2026 · Q4 closes 31 Dec 2026 · MWW §295-1 compliant · USC FCCCHR Listed
Assembly · Type PVB · ASSE 1020

Pressure Vacuum
Breaker Assembly.

A single spring-loaded check with an air-inlet vent that opens whenever supply pressure approaches atmospheric. Back-siphonage protection only — never back-pressure. The standard for irrigation laterals across Milwaukee County.

Construction

A Pressure Vacuum Breaker contains a single spring-loaded check on the main flow path and a separately-spring-loaded air-inlet poppet that vents the downstream side to atmosphere when supply pressure drops within about 1 psi of zero. Two test cocks let the tester verify (a) that the air inlet opens above 1.0 psid below the check, and (b) that the check itself holds at ≥ 1.0 psid. The assembly is sized for back-siphonage only; it cannot stop back-pressure because the air inlet vents downward when supply pressure exceeds atmospheric.1

Potable supply → SOV-1 air inlet CK SOV-2 → irrigation lateral TC#1 TC#2 ↥ 12″ min above highest sprinkler head
Plate 05 · PVB-1. Air-inlet poppet above the check. Must mount ≥ 12″ above the highest downstream outlet (typically the highest sprinkler head).

Why a PVB is never for back-pressure

This is the question we are asked most often by customers: "If the air vent is on top of the assembly, why can't it stop back-pressure from below?" The answer is that the air vent is held closed by the spring whenever supply pressure exceeds about 1 psi gauge. If the downstream side becomes pressurized above the supply, the supply pressure no longer drops, the air vent never opens, and water can be pushed back through a leaking check. The assembly's geometry only protects against the case where supply pressure falls toward zero, which is back-siphonage. The most common error we correct in the field is a PVB installed downstream of an irrigation booster pump, where back-pressure from the booster makes the entire installation non-compliant. The fix is to relocate the PVB upstream of the booster, or to replace it with an RP. The USC FCCCHR Manual §3.4 is explicit about this; we cite it on the rejection notice.

Test sequence (ASSE 5110)

StepActionReadAcceptance
1Close SOV-2. Bleed supply slowly via TC#1.p1 fallingair inlet opens at ≥ 1.0 psid
2Read CK differential at TC#2 vs TC#1.p1 − p2≥ 1.0 psid, tight

Milwaukee-area irrigation rules

Commercial irrigation in Milwaukee follows three local rules in addition to SPS 382:

  • Drain-down by 1 December.

    A PVB freeze-cracks at 28 °F if left wet. We schedule winterization between October 15 and November 30 for accounts on our books.

  • Fertigation = RP, not PVB.

    If the irrigation system has any chemical injection — fertilizer, surfactant, pesticide — the protection is high-hazard and a PVB is non-compliant. RP only.

  • Identification tag visible from grade.

    MWW's inspectors expect to see the tag without unscrewing the insulation cover. We re-tag during the spring start-up if last year's tag has weathered.

USC FCCCHR-approved PVB models we stock

Mfr / ModelSizesUSC list #
Febco 7651/2″ – 2″20-021
Watts 800M4 / 800M4QT1/2″ – 2″20-033
Apollo 4SG-2003/4″ – 2″20-046
Wilkins 720A3/4″ – 2″20-018
Conbraco 40-7003/4″ – 2″20-012

Failure modes

From our 2025 books (n = 412 PVB tests):

  • Air-inlet poppet stuck closed · 34%

    UV-degraded EPDM gasket. Replace poppet kit ($28 part).

  • Check fouled · 24%

    Sediment from irrigation pond or grit from a sprinkler-head replacement.

  • Body cracked from freeze · 18%

    Replacement. Customer skipped winterization.

  • Wrong assembly (PVB where RP required) · 12%

    Fertigation added without re-evaluating protection.

  • SOV worn · 8%

    Brass ball valve seat.

  • Mount height non-compliant · 4%

    Sprinkler head installed higher than originally drawn; PVB now < 12″ above. Re-mount or replace.

References

  1. ASSE 1020 — PVB Assemblies. asse-plumbing.org
  2. USC FCCCHR Manual §3.4. usc.edu/dept/fccchr
  3. SPS 382.41 Table 41. docs.legis.wisconsin.gov
  4. Febco 765 spec. wattscanada.ca
  5. Watts 800M4 spec. watts.com