Assembly · Type RPDA · ASSE 1047

Reduced Pressure
Detector Assembly.

An RP with a 5/8″ bypass meter parallel to the main flow path. Any low-flow event — an unauthorized tap on a fire-only line, a slow leak past a fire-system relief — shows up on the utility's meter read. High-hazard fire service.

Why detector?

A fire service line is unmetered. Water moves through it only when the sprinkler system fires, the standpipe is exercised, or someone — without authorization — opens a connection somewhere on the building side of the assembly. The detector variant adds a parallel 5/8″ meter sized for low flow (typically 0.5–10 gpm) so the utility can see any small, sustained flow that wouldn't register on the main fire-flow meter. A glycol leak, a coffee maker mistakenly tapped to a fire-only riser, an irrigation contractor mis-routed to the wrong meter — all show up on the detector read.1

Wisconsin uses RPDAs (rather than DCDAs) on fire systems that contain antifreeze, foam, or any chemistry — most pre-2000 commercial fire systems in Milwaukee, where the heating contractor added glycol to keep sprinklers in an unheated stairwell from freezing. SPS 382.41(11) Table 41 prescribes the RPDA for any "fire system containing additives." We file the AHJ submittal on the day of test, separately to Milwaukee Water Works for the meter read and to the local fire marshal's office for the system inspection.

5/8" meter bypass RP Fire service → → Sprinkler riser CK-1 RV CK-2
Plate 07 · RPDA-1. Main RP path with parallel 5/8″ detector meter and bypass RP. Configured for 4″ fire service.

Construction

The main path is a full-size RP. The bypass is a smaller RP (typically 3/4″ Watts 909 or Wilkins 375) in parallel, with a low-flow detector meter in series with the bypass. At any flow below the cracking pressure of the main check, water diverts through the bypass and the meter logs it. At fire-flow rates the main checks open and the bypass is bypassed.

Test sequence

The annual test is an RP test on the main path, an RP test on the bypass path, and a meter accuracy check on the bypass meter. All three pass / fail conditions must be met for the assembly to pass. We file three separate test forms to the AHJ and one consolidated report to the customer.

Fire-service rules

  • Coordinate with FD inspection.

    When the fire department conducts its annual sprinkler-system inspection, we align our backflow test to the same morning whenever possible. One shutdown.

  • Notify monitoring station.

    The customer's alarm monitoring company must be on-test before we close any valve on a fire-line assembly. We supply the standard letter MWW expects.

  • Re-test after firefighting use.

    If the sprinkler system fired between annual cycles, the assembly is re-tested before being put back into service. Any RPDA can foul during high-flow.

USC FCCCHR-approved RPDA models

Mfr / ModelSizesUSC list #
Wilkins 350ADA / 375ADA2.5″ – 10″47-005
Watts 957RPDA2.5″ – 10″47-008
Ames C5004″ – 10″47-011
Conbraco Apollo 4ADA2.5″ – 8″47-014
Hersey FRDC4″ – 10″47-002

References

  1. ASSE 1047. asse-plumbing.org
  2. NFPA 13 — Standard for the Installation of Sprinkler Systems. nfpa.org
  3. SPS 382.41 Table 41 (antifreeze fire systems). docs.legis.wisconsin.gov
  4. Wilkins 350ADA product page. zurn.com
  5. Watts 957RPDA spec. watts.com